Licensed • Bonded • Insured · ROC 333515 · ROC 341933Phoenix · Glendale · Peoria · Sun City · Sun City West · Surprise · Call (623) 321-4177
Home / Guides / Questions

Do I Need a Panel Upgrade to Install an EV Charger?

You need a panel upgrade for an EV charger only if your panel cannot safely carry the added load. An electrician runs a load calculation to find out. Many homes can take a charger as is, and some need a load management device or a subpanel instead.

How does an electrician decide if my panel can handle an EV charger?

An electrician performs a load calculation under the National Electrical Code, adding up your service size and the existing loads such as air conditioning, range, dryer and pool equipment. The result shows whether room remains for a continuous charger load.

The calculation is not a guess from the breaker count. A panel with open slots can still be out of capacity, and a crowded panel can still have room, depending on the actual loads.

Arizona homes carry a heavy air conditioning load, which is why the numbers can be tight. We look at the panel label, the service rating and what is connected before recommending anything.

What are the options if my panel is full?

If your panel is full or short on capacity, the options include a load management device, a subpanel, a panel upgrade or a service upgrade. The right choice depends on the load calculation, the charger amperage you want and how your household uses power.

A load management device, sometimes called an EVEMS, limits the charger so the panel never overloads. It can be the cheapest fix when the main service is fine but the calculation is tight.

A subpanel adds breaker spaces when slots are the problem. A panel upgrade replaces the main panel, and a service upgrade raises the supply from the utility. Both need permits and coordination with the utility.

Ask the electrician to explain the calculation in plain terms and to leave you a copy of the result. That paper is useful if you add a pool, a second car or a larger air conditioner later, because the next person can start from the same numbers.

Will a lower amperage charger avoid a panel upgrade?

A lower amperage charger can avoid a panel upgrade in some homes, because it draws less continuous power and needs a smaller breaker. A 32 amp charger on a 40 amp breaker asks less of the panel than a 48 amp unit on a 60 amp breaker.

Speed drops with amperage, but many drivers still refill overnight on a lower setting. Many chargers allow you to set the output, so you can start low and adjust if the panel allows it.

Check your car's maximum charge rate before paying for a bigger charger. If the car cannot accept more, extra amperage buys nothing.

Does an EV charger installation need a permit and inspection?

A new 240 volt EV charger circuit generally needs an electrical permit and inspection from the city or county building department. A licensed contractor normally pulls the permit and is responsible for the work. Confirm the requirement for your city, and never skip it.

Permits protect you when you sell the house and when your insurer asks questions. The inspector confirms the breaker, wire size and connections.

A panel upgrade also requires a permit and often a utility disconnect and reconnect. Plan for a short power outage during that work.

Panel work usually means a planned outage, so schedule it for a cooler part of the day if you can. In the summer heat, a house without power gets uncomfortable fast, and a good electrician will tell you how long the power will be off before work begins.

Need an EV Charger Installed?

Vortech installs Level 2 home chargers across Phoenix, Glendale, Peoria, Sun City, Sun City West and Surprise. See EV charger installation or read the full guide on this topic.

More questions: Home EV Charger Installation: 12 Most Asked Questions Answered

Related Services

Service Areas

Frequently Asked Questions

How long does a panel upgrade take?

A panel upgrade often takes a day, though permits, inspection and utility scheduling can add time before the power is back to normal. Your electrician will explain the sequence and expected outage once the panel has been inspected and the scope is clear.

Can I charge an EV on a 100 amp service?

Often yes, with the right charger setting or a load management device. A 100 amp service in an Arizona home with central air is tight, so a load calculation is needed first. An electrician can tell you what charger size fits safely.

Does adding a charger require a utility call?

A charger circuit on your existing service usually does not need the utility. A service upgrade does, because the utility handles its side of the connection. Your electrician will tell you which applies after the load calculation and site review.

AC down or electrical acting up?

Call now or request a visit. Licensed in both air conditioning and electrical, so one company handles it.

Call NowText Us